바기오 지역 정전 스케쥴(Oct. 6 - Oct. 11)

DATE

TIME

FDR/CKT

AREAS AFFECTED

PURPOSE

ESTIMATED
NUMBER OF
CONSUMERS
AFFECTED

ESTIMATED
UNDILEVERED/
UN-USED ENERGY
(KWHR)

Oct. 06, 2014
(Monday)

9:00AM-5:00PM

Dalicno Line

Parts of Coros, Bayantel Station, Pasiday, Ampucao Itogon

BENECO POWER INTERRUPTION: 
- Replacement of rotten wood poles

50

178.00

Feeder 2

Gibraltar Brgy. (sitios/puroks along/nearby Gibraltar Road - from BWD Gibraltar down to DENR-CENRO), Hotel Elizabeth, Wright Park Condominium

BENECO POWER INTERRUPTION:
- Relocation of primary poles

641

1,301.87

Oct. 07, 2014
(Tuesday)

9:00AM-5:00PM

Dalicno Line

Dalicno - Itogon

BENECO POWER INTERRUPTION: 
- Replacement of rotten priimary pole

421

614.47

Feeder 2

Parts of Ciudad Grande Phase I - Bakakeng Norte/Sur (Gumamela St., Gardenia St., Dama de Noche St., Dona Aurora St. Bougain Villa St., Purok 10 Ext'n)

BENECO POWER INTERRUPTION:  
- Replacement of rotten primary pole

205

421.47

Feeder 2

Parts of Bakakeng Norte/Sur, Bareng drive, North Cambridge, Near SLU-Bakakeng, Baguio City

BENECO POWER INTERRUPTION: 
- Extension of single phase 23kV line; Installation of
  1-25kVA buyback transformer

113

800.00

Luelco Line

Dungon - Sison, Pang, Klondykes, Camp 1, Tuba

BENECO POWER INTERRUPTION: 
- Replacement of damaged concrete pole and conversion
  of 13.2kV primary line to 23kV

565

304.00

HEDCOR LINE

Major parts of Bagu, Dalipey, Sinacbat, Kayapa, Ampusongan, Central, Bakun

BENECO POWER INTERRUPTION: 
-
Diversion of communal transformers from Hedcor Line
  to Circuit 4

923

244.00

Oct. 08, 2014
(Wednesday)

9:00AM-5:00PM

Feeder 2

Major parts of Eagle Crest Phase 1, Bakakeng Norte/Sur, Baguio City

BENECO POWER INTERRUPTION: 
- Replacement of 240V lines from #1/0 ACSR to
  #4/0 ACSR

121

231.20

Feeder 11

Pacdal, Ambuklao Road, DENR, Parts of Saint Joseph Village, LTO, NTC, Parts of Gibraltar (Purok 3, nearby Ambuclao Road), Beckel, Upper Ambiong - (LTB), Luneta - Loacan, Tuding, Gumatdang, Ucab - (Itogon), Pucsusan - B.C.

BENECO POWER INTERRUPTION:
- To facilitate opening of disconnect switch (DS).

9,727

453.25

Pacdal, Ambuklao Road, DENR, Parts of Saint Joseph Village, LTO, NTC, Parts of Gibraltar (Purok 3, nearby Ambuclao Road), Upper Ambiong - (LTB)

BENECO POWER INTERRUPTION: 
- Extension of three phase 23 kV line; Installation of
  3-37.5 kva buyback transformer

3,276

4,448.00

Oct. 08, 2014
(Wednesday)

9:00AM-5:00PM

Circuit 1

Gaswiling, Sagubo, Gadang - Kapangan

BENECO POWER INTERRUPTION: 
- Replacement of rotten primary & secondary poles

711

276.69

Feeder 11

Parts of Loacan - Itogon (nearby jeepney turning point)

BENECO POWER INTERRUPTION:
- Replacement of undersized secondary poles

122

175.10

Feeder 2

Woodsgate Subdivision - Camp 7, B.C.

BENECO POWER INTERRUPTION: 
- Replacement of rotten crossarm

93

243.94

Dalicno Line

Tangtangadan, Abucayan - Virac, Itogon

BENECO POWER INTERRUPTION:
- Replacement of rotten secondary pole

62

143.62

Oct. 09, 2014
(Thursday)

7:00AM-5:00PM

Feeder 3
Feeder 4
Feeder 5
Feeder 6
Feeder 7
Feeder 8
Feeder 9
Feeder 10

Sablan, La Trinidad-Benguet (Except: Beckel), Baguio City (Except: Kias, PMA, Atok Trail, Loakan (Proper/Liwanag/Apugan), Loakan Road, VOA, Scout Barrio, Upper Ambiong, Ambuklao Road, Pacdal, Gibraltar, Minesview, Lualhati, Outlook Drive, Lucnab, Pucsusan, South Drive Brgy, Baguio Country Club, BCC Village, Happy Hallow, Camp John Hay, Lower/Upper Cabinet Hill, Teachers Camp, Greenwater Village, Military Cut-off, Hillside, Sta. Scholastica Village, Upper/Lower Dagsian, Gabriela Silang, Camp 8, Poliwes, Lower Balsigan, San Vicente, Camp 7, Montibello Subdivision, Crestwood Court, Eagle Crest I & II, Ciudad Grande I & II, Forest Gold, SLU-SVP - New Site, SLU-Bakakeng, BWD Dedicated Line), Poblacion Tuba, Taloy Norte/Sur, Asin Road, Tadiangan, Nangalisan, San Pascual - Tuba, Caponga - Tublay

NGCP POWER INTERRUPTION:

1. To convert Str. no. 21 from type 3T to 2H due to
    eroded foundation caused by Typhoon "Mario";
2. To replace rotten poles and crossarms of Str. nos.
    62 & 82;
3. To correct low line-to-ground clearance between Str.
    nos. 53-54, 55-56 & 66-67.

NGCP tel. nos: 444-7423 / 7425
                         442-2536 / 6224

137,295

33,110.18

Oct. 10, 2014
(Friday)

9:00AM-5:00PM

Dalicno Line

Luneta - Loacan, Tuding, Gumatdang, Ucab - Itogon, Pucsusan, B.C.

BENECO POWER INTERRUPTION: 
-
Extension of 23 kv lines and conversion of Vee-phase
  23 kv lines to 3-phase

902

904

Feeder 11

Parts of Loacan - Itogon (nearby jeepney turning point)

BENECO POWER INTERRUPTION:
- Replacement of undersized secondary poles

122

175.10

Oct. 11, 2014
(Saturday)

9:00AM-5:00PM

Feeder 2

Pasingue - Twinpeaks, Tuba

BENECO POWER INTERRUPTION:
- Correction of low sagging primary & secondary lines

7

4.36